This project involves a slight reconfiguration of an existing small bathroom. The bathroom currently has a toilet, small ( --- ) shower, vanity, hot-water cupboard, and laundry. This project will install a new ( --- ) shower, which needs to be installed approximately 2 metres from the current shower. The access to the hotwater cupboard will need to be relocated (i.e. the existing cupboard filled in and a cupboard door put on a different wall). A non-structural wall which currently separates the toilet from the shower is to be removed, and a larger vanity unit installed. The existing toilet replaced with a newer model in the same place. The vinyl floor will be replaced with a new vinyl floor, an extractor fan fitted and the room painted. I do not believe a consent is required for this work as no additional sanitary features will be installed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job completed to a high standard. Very helpful suggestions made when we encountered problems, and no issues with communications.
Reviewed on 14-07-2022
Tradesperson reply
"Excellent communication from the clients, we brainstormed together to get the end product. Thanks for the opportunity to be part of your renovation. Will definitely help out in the future!"
Partner with Builderscrack
Get work