Take out and replace vanity, shower, wall cabinet. Remove bath. Remove exsisting door to replace with sliding door.Re gib walls, reinstate flooring where needed. Work to be started and completed ideally before Dec 10th 2021.
#1 | Tradie 1 |
|
62 jobs | No longer in contact |
#2 | Tradie 2 |
|
51 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
Partner with Builderscrack
Get work