Published on 6 November 2024
a kick board has swollen and needs replacing; three side panels have swollen from the floor up about 100mm (only at the front end of the panel) and needs either replacing or cutting out
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
did what they said they would, on time and on budget
Work carried out by the owner/operator
Reviewed on 8 December 2024
Tradesperson reply
"Thank you very much"