Plumber required. Renovating a small bathroom. Shower and vanity waste use to go through the wall. I have cut the concrete floor and lifted It for you to re run the new shower and vanity into the toilet waste. This is currently earthenware which will be upgraded by you. Plumbing works required asap so this sleepout can be finished. Thanks.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work