Bathroom Renovation
Rodney

I would like the heated towel rail and attendant switches moved to another wall, two new lights added to the wall at each side of the mirror and an existing plug removed.


Review

Workmanship
3.0
Cost
3.0
Schedule
3.0
Communications
2.0

Not sure if this is normal, but the workmen drilled 3 holes in one wall to remove one plug and 7 holes in the other wall in readiness to re-install the heated towel rail onto that wall. I was told that plastering needed to be done before this could be completed. I am still waiting for the workmen to come back and re-fit the heated towel rail. I had sent a message to Nav via this website asking that I be contacted to arrange a time to finalise this but so far have not received a reply.

Work carried out by an employee of the company
Reviewed on 23-04-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo