Can pay Cash. Wanting to replace the old with the new. New vanity and toilet. The vanity will be changed from a floor unit to a floating so will require the removal, refitting and stopping gib. The same with the toilet to get rid on the pipes going into the cistern.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Did such a great job and communication was good too. Really happy with the job done.
Work carried out by the owner/operator
Reviewed on 01-08-2017
Partner with Builderscrack
Get work