A two bedroom ground floor block unit that requires a new kitchen( kitchen will be constructed at a factory and installed by them) bathroom and some guttering. This is a like for like, quick job. So a deconstruct and replacement. I have painters and will assist the deconstruction, the job needs to be started between 8 -14 November 2023. this is one of five properties that need to be done over the next five months. Dave
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
24 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
26 jobs | No longer in contact |
#6 | Tradie 6 |
|
11 jobs | No longer in contact |
#7 | Tradie 7 |
|
5 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 1 job | No longer in contact |
Partner with Builderscrack
Get work