Demo old bathroom in lockwood home- 1.75m x 2.15m Ideally completion period in 4-8 weeks. Water damage to particle board beneath floor and shower wall. Install new ply floor Batten walls and ceiling if needed for new electrical lights, vent. Plumber and sparky required Install new aqua line as needed Install timber trims to window and door. Door to be sliding barn style on rail. Gib, gib stop and paint ceiling. Raked ceiling. Waterproof and tile. Tiles have been purchased ( --- x 100 for wall; --- for floor). Window wall 2.3m. Door wall 2.8m. Install shower, toilet, vanity, basin, mirror, fixtures. Vanity has been purchased. Remove all rubbish on completion.