Two stages of renovation. st stage requiring gutting gibs from two rooms then insulate walls and regib. Second stage is for doing the same for a bathroom First job to happens ASAP the second phase in mid Second week of November.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Colin and the team did a great job, firstly gutting the gibs from the master bedroom and the walkin wardrobe and then inserting insulation and reinstalling gibs, plaster and paint. They were meticulous enough to produce a good smooth plastered surface and the paint job was a fine one. We are starting the second phase of the renovation this coming Monday. I am very happy with the result of the first phase and can recommend Colin. Communication has also been excellent.
Work carried out by the owner & subcontractors
Reviewed on 03-11-2016
Tradesperson reply
"Thank you Omid."