External door needs to be removed, re-framed and a put back in with new flashing. A new sill will need to be made and also weatherboard to be replaced. House has be lifted and made level and weatherboard was removed to allow new concrete footing to be poured.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent communication and workmanship! Highly recommend George and the team! Lots of great advice and follow up. We are continuing to use the for other jobs too!
Work carried out by the owner/operator
Reviewed on 09-09-2022
Partner with Builderscrack
Get work