Bathroom: existing tiling removed, potential water damage behind tiles due to previous leak so wanting all removed, regibbed and retiled. Installation of shower screen and installation of vanity. Door also needs to be refitted as currently doesn’t close. Kitchen: installation of new kitchen cabinets that we will source. Back door to be replaced also. No specific timeline required, willing to wait for availability, need a clear timeline though as also wanting to replace flooring and have whole house repainted.
#1 | Tradie 1 |
|
139 jobs | No longer in contact |
#2 | Tradie 2 |
|
112 jobs | No longer in contact |
Partner with Builderscrack
Get work