Remove existing wall paper. Parts of existing ply to be removed to check for water damage behind the wall All plumbing points to remain in the same position Bath to be retained New shower screen New fixtures and fittings, this includes, new toilet, new basin/vanity, new tapware, new showerhead (all supplied by client) Builder to allow for installation of new fixtures and fittings Tile the whole bathroom, floor + wall Any rotten flooring to be replaced
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Daniel did an amazing job. He completely stripped our old dated bathroom and put everything in new. Would recommend to anybody without hesitation.
Work carried out by the owner/operator
Reviewed on 29-10-2018
Tradesperson reply
"Thank you. So glad you love your new bathroom"
Partner with Builderscrack
Get work