re line bathroom walls with seratone. Replace bath with shower. Re-locate hand basin and install new one (free standing). replace toilet. Bathroom is approximately 20 square meters. - may need new false floor as well.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Craig's work was great. However, the plumbers work was not so good. No toilet for 2 and half weeks, had shower working under old system when everything was re connected water pressure was so low that even the cold water was a dribble.
Work carried out by the owner & subcontractors
Reviewed on 29-06-2023