Ensuite bathroom renovation project includes: -Demolition -New Footings (concrete/timber piles) -Plumbing/electrical (first fix) -Carpentry (wall framing, ply walls and floor, plasterboard fix, sliding timber door) -Plumbing, electrical (second fix) -Waterproofing membrane -Tiles -Second Fix All bathroom fittings and tiles already purchased. Ensuite bathroom is adjacent to main bathroom which was recently renovated. Estimated timeframe for completion 15 days.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very professional. Good communication. Timmely. Craig and the team did a great job renovating our bathroom. We would not hesitate to recommended it.
Work carried out by the owner/operator
Reviewed on 31-05-2023