Installation of kit set kitchen cabinets (already assembled), handles, and bench top. Require sink mounting on bench top, and connection to plumbing(?) 2x 900mm wide base cabinets 1x 450mm wide drawer base cabinet 1x 600mm wide pantry 2x straight bench tops 3x end panels (one with space for dishwasher) See image for layout All demo and prep will be complete by July 9th. Work to be completed ideally by the 18th of July.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tee was excellent. He was flexible with working around other tradies, unexpected changes, and helped to problem solve when I made a miscalculation. He worked fast and efficiently and his workmanship is detailed and beautiful! Would highly recommend.
Work carried out by the owner/operator
Reviewed on 13-08-2021
Partner with Builderscrack
Get work