We have a bathroom and toilet that we are redoing after having a pipe burst. We are at the stage of regibbing. Around 10sqm all up at a guess. Ideally to be done as soon as possible. At a guess it needs gibbing, plastering, shower, vanity, laundry, toilet installed and flooring done (probably tiles).
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
34 jobs | No longer in contact |
#3 | Tradie 3 |
|
26 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 52 jobs | No longer in contact |
#6 | Tradie 6 |
|
20 jobs | No longer in contact |
Partner with Builderscrack
Get work