We need tiles, timber laminate flooring and fixtures removed; then floor, skirting and shower prepared for tiling. The bathroom is small to medium in size. Preferred dates would be either this week, or between 18-29 March.
#1 | Tradie 1 | No recent reviews | 5 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 43 jobs | No longer in contact |
#4 | Tradie 4 |
|
9 jobs | No longer in contact |
Partner with Builderscrack
Get work