We have scheduled in a new kitchen for early November, and we need to: 1. Remove the wall between the kitchen and dining room, 2. Remove the wall between the dining and living room, 3. Install a cavity slider behind one of the kitchen walls.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
John did the work while we were away to high standard, and we came back to a space ready for the new kitchen.
Work carried out by the owner/operator
Reviewed on 12-11-2018
Tradesperson reply
"Hi Kester and Nicola,
Thanks so much for the great review. It was an absolute pleasure.
Kind regards,
John"
Partner with Builderscrack
Get work