Take out existing bath and put in new bath (englefield studio) and cradle with plywood(?) panels on open 2 sides and flush to wall on 2 sides. Existing tap to be moved up approx 100mm.
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 8 jobs | No longer in contact |
#4 | Tradie 4 |
|
50 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 22 jobs | No longer in contact |
Partner with Builderscrack
Get work