Supply and install two cavity sliders for toilet area. One existing toilet wall has the old shower plumbing to remove prior to cavity slider install. Bathroom extension: Demolish existing bathroom wall/doorway which is backed by linen cupboard and hallway. Build new bathroom door frame in existing hallway and hang door. Install aqualine GIB to paintable standard as appropriate for newly created wall space. Fixtures upgrade: Install new owner supplied shower and fittings (simple acrylic liner and tray; plumb shower tap fittings). Install new owner supplied acrylic corner bath in stand. Licensed builders previously onsite for unrelated renovations have not indicated any load bearing walls present in proposed cavity slider / bathroom door area.
#1 | Tradie 1 |
|
59 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work