Tile a new shower installation as well as halfway up walls and all of the floor of the bathroom. Tile halfway up walls and all of floor of a separate toilet room. We are in the process of applying for a building consent through the local council and will need to provide a PS3 certificate to allow the building consent to be signed off. We would like if possible to have the job completed over the next three months or so.
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work