Review

NP bathroom

Job image
Job image
Job image

Job description

Bathroom Design
New Plymouth

My bathroom and toilet are currently separate. I want to combine the 2 rooms. I want the room completely updated. I would like a skylight and cavity slider door added. The new toilet can stay in the same position, but I want to move the vanity and shower positions. I want floor tiles (maybe 10 m2), and will need an electrician for lighting and plugs. My laundry door also needs to be rehung as it cannot be opened at the moment


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Fantastic in all regards

Work carried out by the owner & subcontractors
Reviewed on 02-07-2017

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo