Active job

Shower and toilet install

Job image
Job image
Job image
Job image

Job description

Bathroom Renovation
Nelson

We will remove the existing bath and we will do the finishing work after new shower has been installed. We will remove the existing shower after new shower has been installed. The new toilet will go where the old shower has been removed against an outside wall that has access to an existing sewer from toilet next door. The new shower size will be 1200 x 900 and has not been purchased yet. We have attached a plan of the work. The time frame would be: 1. New shower installed after we remove bath. 2. We then remove old shower. 3. New toilet installed.


Trade professionals

#1 Tradie 1 No recent reviews 4 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo