Review

woodburner installation

Job description

Structural renovations
Masterton

in an old fireplace a new woodstove is to replace it. 2 meters of wall is to be removed and strengthening is required. a concrete hearth is to be poured 1.2sq m. and tiled some lighting and plumbing will be required but we can arrange those people.I have relevant permits


Review

Workmanship
5.0
Cost
4.0
Schedule
5.0
Communications
5.0

good people to have working for me. They were very efficient, quick and able. no time was wasted they got stuck in and got the job done. thanks guys.

Work carried out by the owner/operator
Reviewed on 22-10-2015

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 20 jobs Secured job
#2 Tradie 2
12 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo