1.Remove the cubicle shower and replace it with walk-in shower, tiled from floor to ceiling ( shower only) half of the bathroom to be painted due to a limited budget. Replace the basin and install towel rack. The bathroom measure at --- . Floor to ceiling is 2400. Tile flooring on the separate toilet. With a measurement of --- . If possible I want the work done by the end of November.
#1 | Tradie 1 | No recent reviews | 27 jobs | No longer in contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 4 jobs | No longer in contact |
#5 | Tradie 5 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work