- remove existing shower and built-in bathtub and replace with a frameless walk-in 1500mm by 800mm shower (supplied by homeowner) with a niche - replace toilet and vanity into existing positions (supplied by homeowner) - replace floor tiles in both the separate toilet and bathroom with new ones 600 by 600mm - install 3 full wall tiles (600 by 600mm) in the bathroom only (supplied by homeowner) - install 3in1 heated lamp/extractor fan/lights with additional extractor fan in the bathroom -install a new heated towel rack (supplied by homeowner) in the existing position.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 |
|
559 jobs | No longer in contact |
#3 | Tradie 3 |
|
40 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
44 jobs | No longer in contact |
#6 | Tradie 6 |
|
20 jobs | No longer in contact |
#7 | Tradie 7 |
|
37 jobs | No longer in contact |
Partner with Builderscrack
Get work