Pulling up of wall and floor tiles. Removal of tiled shower. Moisture reading and then relining (waterproofing) of shower area. Instalment of 800 x 800 2 panel sliding door round shower (with tray and wall liner). Removal of vanity and cabinet. Installation of wall hung 900mm vanity & flat mirror. Re-tile walls and then install vinyl on floor. Shower, vanity, mirror, vinyl and tiles all supplied.
#1 | Tradie 1 |
|
63 jobs | Secured job |
#2 | Tradie 2 |
|
17 jobs | No longer in contact |
#3 | Tradie 3 |
|
14 jobs | No longer in contact |
#4 | Tradie 4 |
|
101 jobs | No longer in contact |
#5 | Tradie 5 |
|
73 jobs | No longer in contact |
#6 | Tradie 6 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work