Need to dismantle and remove old kitchen(20yrs old) and disconnect appliances and modify electrical wiring according to new kitchen design. All walls to be prepared/painted before new installation by design team. Need plumbing disconnected and readied according to new kitchen design. So need Electrical/Plumbing/Carpentry/Painting team in one or coordinated by one contractor so we don't need to deal with each individually. Flooring work already contracted out separately.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Bobby is an excellent liaison and coordinator.
Work carried out by a subcontractor
Reviewed on 19-11-2019
Partner with Builderscrack
Get work