Remove existing bath with shower over. Remove existing wet wall lining surrounding the bath. Install new --- acrylic shower. Supply and install new gib to make good the wall. Plaster and stop as necessary ready for painting. Supply and install new wooden trim as required to make good. Remove demolition and building rubbish. I have a plumber available to work with the builder. The shower will arrive week starting 31 May. Work can start immediately. We would like the job finished by end June.
Partner with Builderscrack
Get work