Published on 25 March 2017
Floating timber floor removed, levelled and replaced in open plan kitchen/lounge 2 Walls re-gibbed and gib stopped ready for painting Kitchen removal and takeaway new flatpack cabinetry installed, including dishwasher - so electrician and plumber may be needed Note: Kitchen flat pack not purchased as yet so guidance on basic design would also be useful
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 12 July 2017
Partner with Builderscrack
Get work