Published on 22 September 2024
Hi I'm looking to renovate my bathroom and looking for a painter to do the painting. Would be a bonus if you could do the plastering/gib stoping as well. Current timeline plan: 1) Disconnect plumbing (4 October) 2) Strip bathroom 5th and 6th of October 3) get plumber back in sometime within 7 October and 12 October to do plumbing up the wall for the shower. 4) gib walls 5) get plasterer/painter in (thinking late October depending on tradesmen schedule) <<-- 6) get plumber back to plum shower fittings and vanity Thank you for your time.