Require replacement of shower and floorboard in bathroom, hallway and potentially bedroom as well as shower replacement. This is due to water damage causing the chipboard to become soft and brittle. 3.7mx2.6m area worth of flooring as shown in the floor plan picture. If you can do lino and carpets thats a plus but not a requirement. Would like someone to come around to check out and quote.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 14-03-2024
Partner with Builderscrack
Get work