Current deck is rotting and not to code. Demolition and disposal of current deck, removal and disposal of old clotheline. Construct deck to code (might need build consent depending on height of new deck). Construct shade to one side like old deck (would like to discuss this possibility in greater detail). Steps down to ground from 2 sides. We can explore cost effective options to timber and cost effective deck configurations if there are any. Nothing too fancy, good basic construction resulting in a safe space for outdoor enjoyment. Create concrete path way on two sides of house (see pictures). Installing new clothesline. Viewing of property and quotes for work before 20 Aug with a view to start work as soon as possible from Dec
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work