Part of the job is done as per the photos. Only thing left is to complete tiling on the bottom sides, installing shower head and shower doors are left. Grouting and silicone to be done around the tiles. Want it completed this week. How much will it roughly cost?
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
20 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
4 jobs | No longer in contact |
#6 | Tradie 6 |
|
6 jobs | No longer in contact |
Partner with Builderscrack
Get work