We flooded our bathroom and part of the chipboard flooring was exposed. We are needing the floor to be replaced and skirtings if necessary. We also have some Schochures that we need help finishing of too.
Workmanship |
1.0
|
Cost |
5.0
|
Schedule |
2.0
|
Communications |
4.0
|
Phil laid bathroom vinyl twice. First time was lumpy, 2nd time used levelling compound (and stepped it on carpet). Glue marks left all over the floor and window frames. Did not stick to agreed times. John the "builder's" new skirtings not flush to the floor or wall, and not sealed for a wet area. The scochure was cut short in corners and filled with plaster. The bath panel was cut short and was unable to be tiled to. Project went over time frame. Great coms from Ash and discount provided.
Work carried out by the owner & subcontractors
Reviewed on 21-06-2021
#1 | Tradie 1 | No recent reviews | 1 job | Secured job |
#2 | Tradie 2 |
|
11 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 25 jobs | No longer in contact |
Partner with Builderscrack
Get work