We are redoing a small bathroom. Room is already Demo'd. We are after a builder to gib walls and ceiling, minor framing to accomodate new shower etc, plus lay floor so it is all ready for tiler. Shower plus one wall will be tiled too, so whatever prep is needed for that. We are wanting this to begin in approx 2 weeks or as soon as possible after that. We are also happy to do whatever prep I.e sand existing rimu floor etc you would like done prior to starting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We struck gold with Tim. Incredibly helpful, great workmanship, friendly professional service. We would use Tim’s services again without hesitation.
Work carried out by the owner/operator
Reviewed on 17-10-2020
Partner with Builderscrack
Get work