Full fit out post self demo, including shower, vanity (No bath) and possible cavity slider for entry door. Minor plumbing and electrical work required, Along with painting and wall tiling.
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Overall work completed was good. Had a small issue with the sealing of the shower, which slowed things down a little. The silicone behind the vanity was a bit rough and it had been requested that this not be done as we had a tiler coming in and we would seal at that point. We are very pleased with the bathroom build overall. Thanks Maintain to Profit.
Work carried out by the owner & subcontractors
Reviewed on 23-02-2020