1. Building Works Part 1 - Builder Remove tub and dispose Remove & cap off vanity (to be relocated) Cap off bathtub fittings Cap off shower fittings Remove / lift vinyl flooring Remove anything else (mirror) Remove wall linings - **TBC** 2. Plumb Part 1 Relocate vanity fittings Install toilet fittings Install/relocate shower fittings (shower waste) 3. Electrical Part 1 Remove wall heater Pre-wire for fittings (HTR, LED mirror, extractor fan, additional LED lights, Heater, Power sockets) 4. Building Works Part 2 - Builder Check condition of floor Install tiling slate Install shower niche GIB line walls 5. Tiling Install shower base Waterproofing Complete tiling walls and floor 6. Plumb Part 2 Relocate vanity Install toilet Install shower fittings 7. Electrical Part 2 Install Electrical fittings Install shower fittings
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 6 jobs | No longer in contact |
#3 | Tradie 3 |
|
56 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work