Published on 1 March 2024
Showers, mirrors, heated towel rails, fans and lights need to be replaced. heater, splash back needs to be added. a new heated towel rail needs to be added to the ensuite. All rooms need to possibly be re-gibed in parts and walls, trims, window sills and doors need to be repainted. Except for the lighting we will provide all the other components i.e. showers, fans etc.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
4.0
|
Great work from Austin and his team. Thank 😊
Work carried out by the owner/operator
Reviewed on 8 February 2025
Partner with Builderscrack