We have 2 toilet rooms, and want to replace the vanity/sink in both of these. We have ordered 2x of 400mm wall hung vanity, basin mixer, and waste. There are quite large holes in the plasterboard for the existing pipes, and we want this patched too. The earliest this work could commence is 5th February (new fittings are on order). We are away 10th-19th Feb, so could be done after this too
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Slightly more expensive than initially anticipated, as there was additional work needed to move pipes. Looks good, and was done on the day I asked for
Work carried out by the owner/operator
Reviewed on 15-02-2024
Partner with Builderscrack
Get work