Replace existing mixer with new supplied one. Copper pipes. Also move waste from back right to back left. Concrete floor so some cutting and chipping. Needs to be Monday or Tuesday if possible.
#1 | Tradie 1 |
|
257 jobs | No longer in contact |
#2 | Tradie 2 |
|
78 jobs | No longer in contact |
Partner with Builderscrack
Get work