Demolition Work •Remove existing toilet Proposed Work •Waterproofing (tanking?) shower / bathroom floor •Relocating hot/cold water pipe •Relocating drainage (possibly including toilet drainage) •Connecting taps and shower at new location •Installing new toilet including back flow protection device •Installing new bath tab •Tiling floor and wall •Provide and install glass sliding door/ dividing walls between shower space and toilet space Note: All fixtures (taps, shower head, toilet, bath tab, vanity, cabinet) will be supplied by me. Preferably completing the project before Christmas, but flexible.
#1 | Tradie 1 |
|
139 jobs | No longer in contact |
#2 | Tradie 2 |
|
258 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
82 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 1 job | No longer in contact |
#7 | Tradie 7 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work