Review

Shower install #2

Job image
Job image
Job image

Job description

Bathroom Renovation
Christchurch

The existing hand basin and bathtub need to be removed and new hand basin and shower installed The new hand basin will be in approximately the same position as the existing hand basin. The plumbing needs to be moved so that the new shower can go on the opposite wall to where the taps are now. The existing hand basin and bathtub will have to be taken out first so that I can replace the gib and do the plastering and then on the next visit the new hand basin and shower installed. I would like the first part done as soon as possible and then allow approximately a week before the install so I can get the gib plaster and painting done. I already have the new hand basin and an 800 by 1200 shower ready to be installed The plumber would have to supply the pipe to move the taps and install the new drain to the wastewater. On the first visit the plumber will have to disconnect the bath and hand basin then lay the new pipes and waste water for the shower. Then I will do the gib and plastering. Then I will need the shower and handbasin installed and hooked up.


Review

Workmanship
3.0
Cost
4.0
Schedule
1.0
Communications
4.0

Work carried out by the owner/operator
Reviewed on 05-07-2023

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo