- Decommissioning of plumbing so I can remove the existing bathroom (vanity, bath, left wall of existing walk in shower). - Installation of a shower (acrylic + glass side shower unit). - Movement of shower plumbing to the wall the window is on. - Installation of a wall hanging vanity unit - this will require moving over the drain pipe a bit (this goes into the wall). - Sealing off of bath drain and removal of bath taps (not putting in another bath). - Installation of a new toilet (P trap, right side lower inlet) - this is in a separate room. - Re-gib & plaster 3x walls (I will remove lower gib in deconstruction of existing bathroom). - Install skirting on all 4 walls. - Also want to convert to gas heated hot water. Will need to start on this prior to 9 March, or wait until mid to end of April. I am hoping to order all the parts this week, not sure how long it may take for things to arrive.
#1 | Tradie 1 | No recent reviews | 24 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 25 jobs | No longer in contact |
#3 | Tradie 3 |
|
139 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 5 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 57 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work