My bathroom is approximately 4.5 sqm. It’s pretty much the original 1975 fittings. It’s well due an update. As the floor in concrete I think everything is pretty much constrained to current locations but I’m thinking of losing the bath to get a bigger shower cabinet. So the job would be pretty much total Reno from floor to ceiling
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dean and his team did a great job. I found him to very obliging and he and his team worked long hours to get the job finished when he said it would be finished. I even got him to do some other little jobs that needing attending to.
Work carried out by the owner/operator
Reviewed on 05-01-2022
Partner with Builderscrack
Get work