Review

Rebuild tiled shower

Job description

Bathroom Renovation
Auckland

Existing grouting has broken down and there are large gaps through which water leaks. Short term solution is to get it regrouted however, i would like a long term solution which would mean using something like the Wedi system or equivalent. Works includes: - remove existing shower glass/walls/base - install new base and hob (base is roughly 1219mm x 1219mm) - tile shower base and walls - reinstall shower glass and door - reinstall slide shower/mixer face plate - clean up and remove rubbish I will supply tiles.


Review

Workmanship
5.0
Cost
5.0
Schedule
2.0
Communications
3.0

Warren had a good look at the job while onsite and made recommendations that resulted in a more cost effective solution. Had initial issues with scheduling the job but thats water under the bridge. Highly recommended.

Work carried out by the owner/operator
Reviewed on 13-04-2023

Verified Builderscrack review

Trade professionals

#1 Tradie 1
64 jobs Secured job
#2 Tradie 2
3 jobs No longer in contact
#3 Tradie 3
24 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo