Review

Update original bathroom

Job image
Job image
Job image

Job description

Bathroom Renovation
Auckland

Remove old bathtub, vanity and toilet, install a new shower box, vanity and toilet, and a large cupboard on one end wall, a mirror above vanity, 1950's old house rented. Work would need to start this Saturday if possible when tenant vacates a different unit the tenants could use while this is done. Vinyl flooring or tiles on floor and around shower.


Review

Workmanship
2.0
Cost
2.0
Schedule
5.0
Communications
4.0

Work carried out by the owner/operator
Reviewed on 24-01-2023

Tradesperson reply
"Price and variation were both agreed before works carried out. I could not understand why you agreed and then rated cost at such low point. Plumbing works were prepared for your wall hung vanity. You changed your mind in the last minute to floor standing. Waste pipe was not designed for it. You called someone else to change the pipe through floor, without even ask me first. Then you put this cost on me. But I could not agree my workmanship was 2 out of 5."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo