Prefer immediate start. BATHROOM: Replace extg Bath with new Shower box --- . Demolish a small wall partition. Replace extg Vanity 1200, with new 1500 single. Replace extg Toilet suite with a new Comfort Back to Wall toilet suite. Walls - new tiles half way, and paint. Floor - (remove extg vinyl) vinyl LVT or sheet vinyl (on substrate?). Replace extg fan extractor, heat lamp with new ones. New vanity lighting, Reuse extg mirror if possible. New towel rail Replace hung door with a cavity slider? SMALL TOILET ROOM: Replace extg small Vanity, with new. Replace extg Toilet suite with new one. Walls - new tiles half way, and paint. Floor - vinyl LVT or sheet vinyl.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 42 jobs | No longer in contact |
#3 | Tradie 3 |
|
17 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
#5 | Tradie 5 |
|
20 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 7 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 13 jobs | No longer in contact |
#8 | Tradie 8 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work