Existing shower is removed already. Remove old gib. Floor needs to be levelled in the corner. Some new framing required. Only in areas for the door and the return panel. Bottom plate is bowed and out of square. Fit parallel capping to end of bathtub ready for white out return panel. (Then the plumber will install the mixer.) Aqualine gib installed. Confirm with Showerwell that it's ready for shower install.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I highly recommend Malcom. Very professional and he went above and beyond to get our shower installed the way we wanted. The floor had to be levelled, the walls were bowed. A number of issues he was able to sort out after taking over the job midway. We'll be using his services again. A+.
Work carried out by the owner/operator