Published on 23 September 2024
Break down existing shower box, remove gib off walls to shower and toilet room. Dry out framing to acceptable moisture level. Fit new mixer, slide shower, complete shower similar to existing, re-gib walls to suit, plaster and paint.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Super easy to work with Ron. Would highly recommend. From start to finish every step was smooth and simple.
Work carried out by the owner/operator
Reviewed on 23 February 2025
Partner with Builderscrack
Get work